Time to switch focus to renewables, oil billionaire Rokke says

© BloombergA wind turbine under construction at the Avangrid Renewables La Joya wind farm in Encino, New Mexico, U.S., on Wednesday, Aug. 5, 2020. The complex will eventually be equipped with 111 turbines and is scheduled to become fully operational by the end of this year. Photographer: Cate Dingley/Bloomberg
A wind turbine under construction at the Avangrid Renewables La Joya wind farm in Encino, New Mexico, U.S., on Wednesday, Aug. 5, 2020. The complex will eventually be equipped with 111 turbines and is scheduled to become fully operational by the end of this year. Photographer: Cate Dingley/Bloomberg

More from Energy Voice

Latest Posts