A roster of North Sea players has been brought together to begin pre-front end engineering and design studies (pre-FEED) for the Marigold field, which will be developed via Repsol Sinopec’s Piper Bravo platform.
Jose Luis Muñoz talks to Energy Voice on Repsol Sinopec Resources UK ramping up decommissioning, the challenges of “chronic underinvestment” in the sector, and the firm’s $1 billion near-term plan for North Sea projects.
The Health and Safety Executive (HSE) has condemned Repsol Sinopec following a gas leak and shutdown of the Piper Bravo platform, which came after failing to carry out major repairs.