Wood bags US contracts worth £190m, creates 1,000 new jobs

Wood will provide front-end engineering design for the facility, which will be able to process 230,000 barrels of oil per day
Wood will provide front-end engineering design for the facility, which will be able to process 230,000 barrels of oil per day

Breaking